Bearing SelectorPick the right bearing, step by stepVerify a BearingLife, safety factor and fitsLoad CalculatorLoads from your machineWorked templatesFan, gear and shaft load templatesCross-ReferenceNewSame size from other makers. Free, no sign-upBearing AutopsyNewUpload a photo, get the likely causesFailure AnalysisRead damage, find the causeCondition MonitoringVibration, envelope, oil clues, RCMLubricationGreases, oils, cleanliness, oil lifeEquipment AnatomyMotors, pumps, fans, gearboxesFAQ and quick checksSearch the basics in plain languageFind a DistributorSuppliers by brand and city

Learn

Free calculatorsLife, grease, oil, loads and moreFind a bearingSize, rating and equivalents by designationFailure modesDamage types, causes and fixesCondition monitoringVibration, envelope, oil clues, RCMKnowledge libraryLubrication and reliability articlesBearings by machineMotors, pumps, mills, kilns and moreHow-to guidesBearing life, grease, failures, numbersShaft alignmentSoft foot, procedure, tolerances, heatField casesFailure investigations and monitoring cases (licence)Lubrication guidesGreases, oil systems, oil life and costQuick answersPlain-language answers to common questions

More

PricingPartnershipsContact
Shaft alignment · chapter 6 of 9

Shaft alignment procedure

Quick answer

This is the order of work for a normal horizontal machine pair: prepare, rough align, remove soft foot, measure, move vertically, move horizontally, check, and document.

By Tanmay Sharma, founder of Rotec AI · Last reviewed 6 November 2026

1. Why it matters2. Soft foot3. Readings not repeating4. Shims and bolts5. Couplings6. Procedure7. Tolerances and heat8. Special machines9. Planning and cost
Rear larger, same sign: on targetrefrear feet+10 milfront feet+5 mil+0 mil at couplingcouplingOpposite signs: off targetrefrear feet-8 milfront feet+6 mil+20 mil at couplingcoupling
A few mils at the feet swing the centreline a lot at the coupling. Rear value larger, front value smaller, both with the same sign.

Pre-alignment checklist

CheckWhy
Lock out, isolate and tag the drive and the process.Safety first
Read the maker alignment target and any thermal growth data.You may need to offset the cold position
Clean the feet, shims and base; remove paint and rust.Soft foot and non-repeatability
Confirm the pipework and conduit are free, or note them as strained.Strain pushes the machine out after you leave
Check the bolt holes and jacking bolts; have shims in several thicknesses.Avoid running out of move
Check coupling condition, hub fit, runout and bearing play.See earlier chapters
Measure the foot distances and the coupling distance for the tool.Wrong distances give wrong moves

Which machine moves?

Choose a stationary machine and a movable one. Normally the heavier, piped one is stationary and the motor is the movable machine. If the machines are both piped, or both are hard to move, plan a move on both and use a tool that allows it. Before any move, record how much room you have in the bolt holes in each direction: it avoids discovering bolt-bound halfway through.

Steps

  1. Rough align with a straightedge and feeler gauge across the coupling, and a tape check on the shaft gap. Aim for the coupling faces to be parallel and the rims level to a few thousandths of an inch.
  2. Soft foot check at all feet (see the soft foot chapter). Correct before measuring.
  3. Mount the sensors or indicators. Tight, clean and clear of the shaft keyways. Check bracket sag if you use dial indicators.
  4. Take a first set of readings by rotating the shafts together and, for a laser tool, in at least three positions that cover a spread of angle.
  5. Read the result as vertical and horizontal offset and angle at the coupling and at the feet. Compare with the tolerance.
  6. Vertical move first. Raise or lower the movable machine with shims at the front and back feet. Use the tool foot values, measure the shims, and keep the stack small.
  7. Horizontal move second. Use jacking bolts or a push-pull device. Move in small steps and remeasure. Do not hit the machine.
  8. Tighten in the cross pattern, in three passes and measure again. Hold-down tightening often changes the reading by a few mils.
  9. Final check: repeat the soft foot check and take two sets of readings. If the result is within tolerance and repeats, stop.
  10. Back off jacking bolts, record and photograph the final values, and make a note of the shim stack.

Two ways to read the result

You get the answer as foot corrections (what to do at the front and back feet) and as coupling values (what the coupling sees). The coupling values tell you whether you are in tolerance. The foot values tell you what to do next. Work from the foot values, judge by the coupling values.

When the machine runs out of move

Bolt-bound means a foot bolt hits the side of its hole. Base-bound means the foot hits the edge of the base or a stop. Both appear when a machine was set at the end of its range. Options, in order:

  1. Check whether the other machine can move, or whether the stationary one can be the movable one.
  2. Move a different pair of feet. Three-machine trains can use the middle machine as the movable.
  3. Use a purpose-turned bolt or enlarge the hole with the engineer approval (see the shims and bolts chapter).
  4. Re-grout, re-drill or remake the base. This is the long-term fix.

Verify, do not assume

See what happens when bolts are left loose

Questions

What is the correct order for aligning shafts?

Prepare and clean, rough align, correct soft foot, measure, move vertically with shims, move horizontally, tighten and re-measure, then do a final check and record the results.

Should I do vertical or horizontal moves first?

Vertical first. Shimming changes the height, and the horizontal move is then made on a stable base.

What is bolt-bound and base-bound?

Bolt-bound means a hold-down bolt touches its hole before the machine reaches the target. Base-bound means the foot reaches the edge of the base or a stop. Both mean you have run out of move in that direction.

How do I know when to stop adjusting?

Stop when the coupling values are within tolerance and two sets of readings repeat after final tightening. Chasing zero often loses more than it gains.

PreviousCouplings: backlash, runout and stiffnessNextTolerances and thermal growth

General good practice for horizontal machines driven through a coupling. The machine maker's manual, the coupling data and your site standard come first. Lock out and isolate the machine before any alignment work.