Bearing SelectorPick the right bearing, step by stepVerify a BearingLife, safety factor and fitsLoad CalculatorLoads from your machineWorked templatesFan, gear and shaft load templatesCross-ReferenceNewSame size from other makers. Free, no sign-upBearing AutopsyNewUpload a photo, get the likely causesFailure AnalysisRead damage, find the causeCondition MonitoringVibration, envelope, oil clues, RCMLubricationGreases, oils, cleanliness, oil lifeEquipment AnatomyMotors, pumps, fans, gearboxesFAQ and quick checksSearch the basics in plain languageFind a DistributorSuppliers by brand and city

Learn

Free calculatorsLife, grease, oil, loads and moreFind a bearingSize, rating and equivalents by designationFailure modesDamage types, causes and fixesCondition monitoringVibration, envelope, oil clues, RCMKnowledge libraryLubrication and reliability articlesBearings by machineMotors, pumps, mills, kilns and moreHow-to guidesBearing life, grease, failures, numbersShaft alignmentSoft foot, procedure, tolerances, heatField casesFailure investigations and monitoring cases (licence)Lubrication guidesGreases, oil systems, oil life and costQuick answersPlain-language answers to common questions

More

PricingPartnershipsContact
Shaft alignment · chapter 9 of 9

Planning, foundations and cost

Quick answer

The best alignment job is decided before the machine arrives. A sound base, a pipe that does not pull, and a plan for the first start give you an alignment that stays.

By Tanmay Sharma, founder of Rotec AI · Last reviewed 6 November 2026

1. Why it matters2. Soft foot3. Readings not repeating4. Shims and bolts5. Couplings6. Procedure7. Tolerances and heat8. Special machines9. Planning and cost

Foundation and baseplate

ItemGood practice
Base stiffnessA heavy, stiff base resists distortion. Thin skids and light tube frames flex when bolts tighten
FlatnessMounting pads machined or ground flat and in one plane. Check with a straightedge before the machine goes down
GroutingFill the baseplate with grout so it carries the load evenly. An empty or partly filled plate rocks
Pipe and conduitConnect pipework last. Check that flanges meet without force, and re-check alignment after each connection
Bolt holesCentre the machine in its holes so it can move both ways
Jacking pointsWeld or bolt in jacking blocks before the machine is set, not afterwards

Pipe strain

Take the pipe flange bolts off and watch an indicator on the shaft. If the shaft moves more than about 0.05 mm (2 mil), the pipe is pulling the machine. Fix the supports and the flange fit, not the alignment.

When to check alignment

What does it cost, and what does it save?

The figures below come from published studies and trade reports. They are reported values, not guarantees, and your plant will be different.

ItemReported rangeNotes
EnergyAbout 1% to 10% less power after precision alignmentLarge variation; measure your own before and after
Bearing and seal lifeOften reported as several times longerDepends on how bad the starting point was
Alignment jobFrom under an hour for a small pump to a day or more for a trainMost of the time goes on soft foot and hardware, not on the readings
ToolDial set, straightedge, or laser systemA laser system pays for itself on repeat work

How to justify it

  1. List the machines that fail most often on bearings, seals or couplings.
  2. Take a quick vibration reading and a coupling check on each.
  3. Pick the worst three and do them properly.
  4. Record the before and after vibration, temperature and the following 12 months of repairs.
  5. Use that record, not a generic figure, to decide on the rest.

Skills and standards

Alignment is a skill. A trained technician with a simple tool beats an untrained one with an expensive tool. Write a plant standard for tolerances, thermal offsets, shim practice and records, so every job is done the same way.

Put it into practice

Questions

How often should shaft alignment be checked?

At installation, after repairs, after pipework changes and on a schedule that matches criticality. Many sites check critical machines yearly and after any vibration alarm.

How do I know if pipe strain is moving my machine?

Loosen the pipe flange bolts with an indicator on the shaft. More than about 0.05 mm (2 mil) of movement means the pipe is pulling the machine.

Is precision alignment worth the cost?

For machines that repeatedly fail on bearings, seals or couplings, usually yes. Measure before and after on a few machines and decide from your own results.

Does grouting matter for alignment?

Yes. A baseplate that is not fully grouted can rock and distort, and alignment will not hold.